Control System for Bunge’s Soybean Transloading Facility

Client

Location

Rose Hill, NC

Problem:  

Brand new facility that needed a new custom control system.

Specifics:

  • Required electrical engineering services
  • Required on site technicians for smooth start up and training
  • Required on going reliable support services

Solution:

Comco provided electrical engineering services as well as the design and build of the Allen Bradley PLC panel. Comprehensive electrical drawings were provided.  Comco technicians provided on site start up services and continue to support the system as changes and upgrades are required.

Result:

Bunge has a control system that is customized to their specific needs.  Any changes / upgrades that have been requested since the time of start-up have been installed remotely to suit the timeline of the customer.